ISO 9001ISO 14001ISO 45001 / OHSAS 18001
Request a Proposal
Services Projects Case Studies Global Presence About Contact Request a Proposal
Home/Case Studies/Case Study 04
Case Study 04

Air Slide Repairs Inside Silos

Replacement of clogged and worn-out filter bags and canvas on all air slides of a lime silo, completed in a single day.

Work performed

  • Silo cleaning
  • Opening all the air slides
  • Removing and replacing worn-out and clogged filter bags
  • Pressure testing

Scope

A cement manufacturer engaged TALOS at its lime plant, where clogged and worn-out filter bags made it difficult to draw lime. The plant was using more energy to push the lime through and facing delays in packing it for the market. TALOS was asked to change all worn or clogged filter bags and canvas.

Access

The silo's side manhole was used for both entry and exit, and a straight ladder gave access to the air slides at the bottom of the silo.

Solution

The team started with a pressure test to identify the air slides that were not aerating properly. None of the canvases were bulging — meaning the filter bags were clogged or worn out.

All air slides were opened and the clogged filter bags replaced. Torn canvases that were causing pressure leaks were replaced as well.

Results

All air slide filter bags were replaced safely and successfully in one day, as planned. Regular maintenance keeps air slides at optimal performance: lower energy consumption, no material build-up and faster packing of lime or cement.

Planning a shutdown or facing an emergency?

Tell us about your asset and timeline. Our engineers will propose a safe, cost-effective access and execution method.