We work where others can’t reach
Rope access, chimney and silo maintenance, controlled deconstruction and NDT inspections for cement plants, power stations and heavy industry — across Europe, Africa and the Caribbean.
Core engineering competencies

Rope Access & Height Works
Certified rope access technicians and suspended platforms that reach any height, without the cost of conventional scaffolding or heavy lifting equipment.
Learn more
Industrial Smokestacks & Flues
Construction, inspection, painting and structural maintenance of reinforced concrete, brick and Corten steel stacks up to 200 m.
Learn more
Silo Cleaning & Material Flow Restoration
Turnkey cleanout and descaling of clogged clinker, cement, raw meal, fly ash and grain silos — with no-entry methods whenever possible.
Learn more
Controlled Deconstruction & Civil Works
Dismantling of obsolete stacks and structures, non-explosive demolition, emergency response and industrial civil works.
Learn more
NDT & Structural Inspections
Condition assessments with UT, MT, PT, rope access visual inspection and UAV surveys, delivered as actionable structural integrity reports.
Learn moreSilo blockage? Structural failure? Unplanned outage?
Our rapid-response teams mobilize across borders to bring critical assets back online.
+30 695 1751728
Precision under extreme conditions
TALOS General Construction is a specialized industrial contractor operating at the intersection of heavy mechanical engineering, specialized access and technical construction.
Where ground scaffolding or heavy cranes are economically unviable or physically impossible, we deploy engineered rope access, custom suspended staging and high-capacity mechanized rigging — protecting critical production assets and minimizing unplanned downtime.
- Cement plants, power stations, refineries and bulk terminals
- Deployment aligned with planned shutdowns and emergency outages
- Certified ISO 9001, ISO 14001 and ISO 45001 / OHSAS 18001
Selected projects
Cement Plant Brick Chimney Demolition
Power Plant 50 m Stack Painting
Cement Plant 40 m Clinker Silo Cleaning Works No. 1 & No. 2
Cement Plant Preheater Tower Structural Inspection (NDT)
Cement Plant 6 Silos Stabilization 4 Internal Reinforcement
Cement Plant Silo No. 1 Internal Cleaning
Agility without corporate overhead
Turnaround & Outage Agility
We align our deployment with planned plant shutdowns and emergency outages, working 24/7 schedules to bring critical assets back online ahead of schedule.
Safety-Engineered Methodology
Every project is preceded by Safe Work Method Statements (SWMS), site-specific Job Safety Analyses (JSA) and dedicated high-angle rescue planning.
Cross-Border Operational Footprint
From our base in Sofia, our engineering hub in Athens and regional desks in Durrës and Harare, we mobilize personnel and specialized gear seamlessly across borders.
Case studies
Stabilization and Reinforcement of Cement Silos
Structural inspection, emergency stabilization and internal reinforcement of six 25 m cement silos showing deterioration of the outer shell.
Read the case studyCement Mill Roof Demolition
Emergency response after the partial collapse of a cement mill roof: drone inspection, stabilization with a 250 t crane and safe removal of debris.
Read the case studyCement Mill Roof Cleaning
Rope access removal of 20–500 mm of hardened cement and clinker dust from a cement mill roof after a partial collapse.
Read the case studyWhere we work
Europe 48 projects
Caribbean & Latin America 19 projects
Planning a shutdown or facing an emergency?
Tell us about your asset and timeline. Our engineers will propose a safe, cost-effective access and execution method.